Brownfield Capacity Expansion


SbDS · 25% Capital Subsidy · Expansion Anywhere in India


Modernising and expanding India's existing shipyards. Up to 25% capital subsidy, capped at ₹1,500 Cr per yard, disbursed in four milestone tranches.

Titagarh Naval Systems (TNSL)

Falta, West Bengal

IPA Granted
Swan Defence & Heavy Industries (SDHI)

Pipavav, Gujarat

IPA Granted
Brownfield Capacity Expansion
Mat Marine

Kakinada, Andhra Pradesh

IPA Granted
Cochin Shipyard Limited (CSL)

Vadinar, Gujarat

IPA Granted

YOUTUBE EXPLAINER

The scheme that lets existing Indian shipyards expand - 25% of approved project cost as capital assistance, up to ₹1,500 Cr per yard.

Watch on YouTube
4

IPAs Granted

to be sanctioned

₹8,261 Cr

Scheme Overlay

IPA Approved Brownfield Projects


# Shipyard Location Status
1 Titagarh Naval Systems (TNSL) Falta, West Bengal IPA Granted
2 Swan Defence & Heavy Industries (SDHI) Pipavav, Gujarat IPA Granted
3 Mat Marine Kakinada, Andhra Pradesh IPA Granted
4 Cochin Shipyard Limited (CSL) Vadinar, Gujarat IPA Granted

Capital assistance is 25% of the Approved Project Cost, capped at ₹1,500 Cr per shipyard, released in four milestone tranches of 15% - 30% - 35% - 20%.

How the Brownfield Grant Works


Existing Indian Shipyard

Operational ≥3 years before 24 Sep 2025

Expansion Anywhere in India

Capacity, modernisation & technology upgrade

SbDS Brownfield Grant

25% of eligible project cost, up to ₹1,500 Cr per shipyard

Milestone-based disbursement in 4 tranches - 15% - 30% - 35% - 20%.

Eligibility & Key Conditions


Who Qualifies
  • Existing Indian shipyard operational ≥3 years (before 24 Sep 2025)
  • Land owned outright or leased ≥15 years
  • Completion within 6 years of Final Approval
Must Hold ≥3 of 5 Assets
  • Waterfront access · dry berthing · wet berthing
  • Metal fabrication / hull erection facility
  • Material handling (cranes)
Approval Authority
  • IA if assistance ≤ ₹100 Cr
  • NSbM if > ₹100 Cr
  • Excludes maintenance/repair, land cost, pre-IPA projects

Nine eligible components - dry dock, pier/jetty, slipway, shiplift, floating dock, automation & digitalisation, cranes, block/modular fabrication, and channel & basin development - with a case-by-case "any other facility" route reviewed by the IA.