Chennai Seafarers' Club (Outside Port Premises)


Project Name Renovation & Modernization of Chennai Seafarers' Club (Outside Port Premises)
Location Rajaji Salai, Chennai
Implementing Agency Indian Port Rail & Ropeway Corporation Ltd. (IPRCL)
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Renovation & Modernization of Existing Seafarers' Welfare Centre
Plot Area Approximately 1,08,182 sq. ft.
Built-up Area Approximately 37,500 sq. ft.
Building Configuration Three-Storeyed Accommodation Block with Landscaped Open Spaces
Estimated Project Cost ₹10.80 Crore (Inclusive of DPR Fee, PMC Charges & GST)
SWFS Funding Approved Entire Project Cost Approved (₹10.80 Crore)
Implementation Period 28 Months
Accommodation Facilities Premium Suite Rooms, Deluxe Rooms, Single Occupancy Rooms, Dormitories
Major Facilities Seminar Hall with Audio-Visual Systems, Board Room, Restaurant, Bar, Modular Kitchen, Study Room, Tea Café, Recreation & Social Spaces, Administrative Offices, Landscaped Campus
Engineering Components Structural Rehabilitation, ACP Façade Cladding, Solar Power Installation, Electrical & Plumbing Upgrades, Roof Waterproofing, Interior Modernization, Landscaping, CCTV & Communication Systems
Engineering Standards CPWD/DSR Standards, Government Procurement Procedures
Compliance Framework MLC 2006, SWBAT
Current Status Detailed Project Report (DPR) completed by IPRCL; total project cost of ₹10.80 Crore approved by SWFS Committee of Management for implementation through IPRCL.

Chennai Port Authority (ChPA)


Project Name Development of Chennai Seafarers' Club (Inside Port Premises)
Location First Floor, Central Berth Warehouse, Chennai Port Authority, Chennai, Tamil Nadu
Implementing Agency Chennai Port Authority
Project Management Consultant NBCC (India) Limited
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Adaptive Reuse of Existing Port Infrastructure
Project Area Approximately 17,000 sq. ft.
Accommodation 4 Guest Rooms
Project Cost ₹14.62 Crore
SWFS Funding Approved & Released ₹14.62 Crore
Implementation Model Deposit Work through NBCC (India) Limited on turnkey basis
Major Facilities Restaurant, Commercial Kitchen, Bar, Conference Room, Internet Café, Recreation Room, Indoor Games, Fully Equipped Gymnasium, Spa, Sauna, Multipurpose Hall, Shopping Hall, Reception, Administrative Area
Engineering Components Civil, Architectural Interiors, HVAC, Plumbing, Electrical, Fire Fighting, Lift, Furniture & Equipment, Signage & Wayfinding
Engineering Standards CPWD Standards, General Financial Rules (GFR), Competitive Tendering through NBCC
Compliance Framework MLC 2006 (Regulation 4.4), SWBAT, CPWD Standards, GFR
Current Status Project completed under the sanctioned scope; SWFS-approved grant of ₹14.62 Crore released. Future enhancement proposals for façade and ground floor expansion are separate works beyond the approved project.

Mormugao Port Authority (MPA) – Goa


Project Name Development of Seafarers Welfare Centre, Headland–Sada, Goa
Location Headland–Sada, Mormugao Port Authority, Goa
Implementing Agency Mormugao Port Authority
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Seafarers' Welfare Centre (Outside Port Premises) – Redevelopment of Existing Officers Club
Site Area Approximately 5,500 sq. metres
Built-up Area Approximately 1,475 sq. metres
Building Configuration Ground + Three (G+3) RCC Framed Structure with Structural Provisions for Future Vertical Expansion
Accommodation 14 Guest Rooms, 3 Premium Suites, Staff Accommodation
Estimated Project Cost ₹13.52 Crore (Inclusive of Contingency, NBCC PMC Charges & GST)
SWFS Funding Approved Entire Project Cost Approved by SWFS Committee of Management
Major Facilities Restaurant, Outdoor Dining Terrace, Kitchen & Pantry, Conference Hall, Library, Recreation Lounges, Indoor Games Room, Gymnasium, Swimming Pool, Stage & Dance Floor, Currency Exchange Counter, Souvenir Shop, Landscaped Campus, Parking for 25 Vehicles
Engineering Components Demolition of Existing Building, New G+3 Construction, Ancillary Building Refurbishment, Swimming Pool, Compound Wall, Internal Roads, Corrosion-Resistant Marine Construction
MEP & Services Electrical, HVAC, Plumbing & Sanitary, Fire Fighting & Alarm Systems, CCTV Surveillance, Access Control, Solar Water Heating, Solar Power, Lift, Rainwater Harvesting, Borewell & Pump House
Engineering Standards CPWD Delhi Plinth Area Rates (DPAR) 2025, NBCC Preliminary Engineering Estimates
Compliance Framework MLC 2006, SWFS Welfare Framework
Current Status Technical assessment, concept planning and preliminary cost estimate completed; project approved for implementation with full SWFS funding.

Haldia Dock Complex (HDC) – West Bengal


Project Name Haldia Seafarers' Club-cum-Hostel (Outside Port Premises)
Location Ranichak, Haldia, West Bengal
Implementing Agency Central Public Works Department (CPWD) – Construction; Seafarers' Welfare Society, Haldia – Operation & Management
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type New Seafarers' Hostel-cum-Club
Land Area Approximately 1,000 sq. m. (30-year lease from Haldia Dock Complex)
Built-up Area Approximately 1,239.7 sq. m.
Building Configuration Ground + Two (G+2) RCC Framed Structure
Original Construction Cost Approximately ₹6.40 Crore (including contingencies)
SWFS Funding Approved Entire operationalization project approved, including initial operational corpus of ₹1.00 Crore
Accommodation Single Occupancy Rooms, Double Occupancy Rooms, Family Rooms, Dormitories
Major Facilities Reception & Lobby, Recreation Hall, Dining Hall, Kitchen & Pantry, Library/Reading Room, Lift, Parking, Luggage Room, Medical Locker, Laundry, Caretaker Room, Administrative Facilities
Engineering Standards CPWD Standards, Government Engineering Specifications
Compliance Framework Maritime Labour Convention (MLC) 2006, SWFS, Seafarers' Welfare Society Framework
Operation & Maintenance Seafarers' Welfare Society, Haldia under supervision of a duly constituted Managing Committee
Current Status Building completed; statutory regularization underway; SWFS approved funding for operationalization including procurement of furniture, linens, kitchen equipment and initial operational corpus of ₹1.00 Crore; commencement proposed upon completion of statutory formalities and procurement activities.

Kamarajar Port Limited (KPL)


Project Name Development of Seafarers' Welfare Centre (Inside Port Premises)
Location Kamarajar Port Limited, Chennai
Implementing Agency Kamarajar Port Limited
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Greenfield Seafarers' Welfare Centre
Plot Area Approximately 6,912.29 sq. m. (1.70 acres)
Building Configuration Ground + One (G+1)
Project Cost ₹13.00 Crore (excluding GST)
SWFS Funding Approved ₹13.00 Crore plus applicable PMC Charges & Taxes
Implementation Strategy Two-phase execution through open competitive tendering
Major Facilities Restaurant, Gym, Library, Medical Room, Home Theatre, Billiards, Meditation Room, Internet Centre, Forex Facility, Salon, Suite Rooms, Indoor Badminton, Tennis, Volleyball, Swimming Pool
Engineering Standards CPWD Schedule of Rates, CPPP Procurement, Anna University Structural Vetting
Compliance Framework MLC 2006, DG Shipping Circular No. 10 of 2024, SWBAT
Operation & Maintenance Port-funded O&M with proposed Port Welfare Committee
Current Status Civil works completed, interior development substantially completed, SWFS Grant-in-Aid of ₹13.00 Crore plus applicable PMC Charges & Taxes approved.

Cochin Port Authority (CPA) – Mobile Welfare Facility


Project Name Mobile Seafarers Welfare Facility (SWBAT Initiative)
Location Cochin Port Authority (Mobile Deployment Across All 22 Berths including Mattancherry Wharf, Ernakulam Wharf, Vallarpadam Container Terminal, South Puthuvypeen, LNG Terminal & Remote Oil Terminals)
Implementing Agency Cochin Port Authority
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Mobile MLC-Compliant Seafarers' Welfare Caravan (SWBAT Flagship Initiative)
Vehicle Type Custom-Built Luxury Caravan
Vehicle Dimensions 8.5 m (L) × 2.5 m (W) × 3.6 m (H)
Built-up Area Approximately 21–22 sq. metres
Seating Capacity 10–12 Persons
Power Supply 7.5 kVA Generator with Shore Power Connection
Approved Funding ₹1.00 Crore plus applicable taxes and other charges
Annual O&M Estimate Approximately ₹30 Lakh (staffing, fuel, maintenance, insurance, communication services & consumables)
Major Services Free Wi-Fi & Internet, Telephone Booths & SIM Services, Mini Lounge with Refreshments, Counselling & Welfare Assistance, Digital Grievance Redressal Desk (DG Shipping Integrated), First Aid & Basic Medical Support, Mobile Library, ATM & Forex Facilitation, Information & Guidance Services
Vehicle & Safety Features GPS-Enabled Vehicle Tracking, CCTV Surveillance, Fire Extinguishers, Side Entry with Foldable Steps, Fully Air-Conditioned, 250 Litres Water Storage, Integrated SWFS Branding
Digital Infrastructure High-Speed Wi-Fi, DG Shipping Digital Grievance Portal, QR-based Feedback System, Beneficiary Data Capture System, Information Display System
Procurement Method GeM / Open Tender as per GFR 2017, CVC Guidelines & Cochin Port Authority Procurement Procedures
Compliance Framework MLC 2006, SWBAT, Maritime India Vision 2030, Amrit Kaal Vision 2047
Operation & Maintenance Cochin Port Authority through Merchant Navy Club with dedicated annual budget
Current Status SWFS funding approved; Cochin Port Authority has accepted funding conditions and implementation framework. Procurement methodology, institutional mechanism, O&M model and permanent SWFS branding strategy finalized. Project proposed to be commissioned within approximately 10 months through milestone-based execution.

Merchant Navy Officers & Seamen's Association, Kochi (Outside Port)


Project Name Installation of Sewage Treatment Plant (STP)
Location Merchant Navy Officers & Seamen's Association (Merchant Navy Club), Willingdon Island, Kochi
Implementing Agency Merchant Navy Officers & Seamen's Association, Kochi
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Environmental Infrastructure / Sewage Treatment Plant
Purpose Statutory environmental compliance and sustainable operation of Seafarers' Welfare Club
Plant Capacity 15 KLD
Treatment Technology Moving Bed Biofilm Reactor (MBBR)
Estimated Project Cost Approximately ₹57.85 Lakh
SWFS Funding Approved ₹50.00 Lakh
Treatment Process Primary Treatment (Sullage & Sewage) → Equalization & Mixing Tank → Anoxic Treatment → Aerobic Treatment (MBBR) → Secondary Settling → Filtration & Disinfection → Ultra Filtration → Treated Water Storage & Reuse
Major Civil Components RCC Treatment Tanks, Plant Room, Soak Pit, Screen Chamber, Integrated Settler cum Baffled Reactor, Equalization Tank, Anoxic Tank, MBBR Tanks, Secondary Settling Tank, Filter Feed Tank, Disinfection Tank, Treated Water Tank, Sludge Holding Tank, Manholes & Covers
Major Mechanical & Electrical Components Sewage Transfer Pumps, Air Blowers, MBBR Media, Tube Settler Media, Sand Filter, Carbon Filter, Chlorine Dosing System, Sludge Recirculation Pumps, Filter Feed Pumps, Electrical Control Panel
Auxiliary Systems Ultra Filtration Unit, Bio Bin, TOD Meter, Acoustic Enclosure
Treated Water Application Gardening, Flushing and other Non-Potable Utility Purposes
Environmental Compliance Hon'ble High Court of Kerala Directions, Kerala State Pollution Control Board (KSPCB) Norms
Current Status Financial assistance of ₹50.00 Lakh approved by SWFS Committee of Management for implementation of the project.

Syama Prasad Mookerjee Port (SMPK) – Marine Club, Kolkata


Project Name Renovation & Modernization of Marine Club, Kolkata (Outside Port Premises)
Location 2, Nimak Mahal Road, Kolkata – 700043, West Bengal
Implementing Agency Syama Prasad Mookerjee Port (SMPK)
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Heritage Renovation & Modernization of Seafarers' Welfare Facility
Heritage Significance Established in 1925; Main Building Constructed in 1932 — One of India's Oldest Seafarer Welfare Institutions
Plot Area Approximately 116,680 sq.ft. (10,840 sq.m. / 8 Bighas)
Built-up Area Approximately 85,950 sq.ft.
Building Configuration Three-Storeyed Heritage Masonry, RCC & Steel Load-Bearing Construction with Ancillary Staff Quarters and Swimming Pool
Accommodation Capacity 85 Guest Rooms (15 AC, 64 Non-AC, 6 Dormitories)
Approved Project Cost ₹7.75 Crore plus applicable GST, Deposit Work/Supervisory Charges and statutory taxes
Cost Breakup Civil Works: ₹4.33 Crore | Mechanical & Electrical Works: ₹2.77 Crore | Fire Protection Works: ₹0.65 Crore
Major Facilities Multi-Cuisine Restaurant, Dining Hall, Officers' Bar, Billiards Room, Dance Hall, Conference Room, Library, Television Lounge, Swimming Pool, Gymnasium, Yoga & Wellness Centre, Tea & Snacks Outlet, Landscaped Gardens
Structural Rehabilitation Works Detailed Structural Audit, RCC Strengthening & Repair, Crack Injection & Waterproofing, Roof Treatment, Foundation Stabilization
Building Services Upgradation Complete Electrical Rewiring, New Electrical Substation, Air-Conditioning Systems, Plumbing Replacement, Modern Sanitary Installations, CCTV Surveillance, Fire Detection & Alarm System, Emergency Escape Staircase, Lift/Elevator Installation, Solar Power Installation, Energy-Efficient LED Lighting
External Development Façade Restoration, Boundary Wall Improvements, Landscaping & Horticulture, Swimming Pool Renovation, Parking Improvements, Compound Development
Engineering Standards SMPK Civil & M&E Department Technical Estimates, Independent Third-Party PSU Technical Validation
Compliance Framework MLC 2006, SWFS, SWBAT, Heritage Conservation Principles
Implementation Strategy Phased execution under Multi-Disciplinary Project Oversight Committee comprising MMD Kolkata, Shipping Master Kolkata, SMPK Civil/M&E/Marine Departments, SWFS & Independent Third-Party PSU
Current Status Revised project approved by SWFS Committee of Management for comprehensive renovation and modernization based on SMPK proposal, with funding of ₹7.75 Crore plus applicable GST, Deposit Work/Supervisory Charges and statutory taxes.

Mumbai Port Authority (MbPA) – Jawahar Dweep


Project Name Development of Seafarers' Welfare Centre at Dweep Bhavan, Jawahar Dweep (Butcher Island)
Location Jawahar Dweep (Butcher Island), Mumbai Port Authority
Port Type Marine Oil Terminal (Crude Oil, Petroleum Products & Chemical Tankers)
Implementing Agency Mumbai Port Authority
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Adaptive Reuse & Modernization of Existing Dweep Bhavan into Seafarers' Welfare Centre (Inside Port Premises)
Average Vessel Calls 1,106 Tanker Calls per Annum
Estimated Beneficiaries 25,000–30,000 Seafarers Annually (Projected ~29,920 by 2030–31)
Project Cost ₹5.75 Crore
SWFS Funding Status Technically appraised and recommended for financial assistance as capital grant, subject to procedural compliances
Implementation Strategy Adaptive reuse of existing Dweep Bhavan with limited structural interventions, architectural renovation, interior modernization and MEP upgrades
Major Facilities Guest Accommodation, Reception & Waiting Lounge, Recreation Hall, Gymnasium & Wellness Area, Conference & Multipurpose Hall, Pantry & Dining, Medical & First-Aid Room, Communication & Internet Centre, Separate Sanitary Facilities & Changing Rooms, Outdoor Landscaped Spaces
Dedicated Transportation Electric Shuttle Vehicle with Charging Infrastructure for seafarer movement between vessel access points and welfare centre within the terminal
Engineering Components Civil Renovation, Architectural Improvements, Interior Planning & Furnishing, Electrical, HVAC, Plumbing Upgrades, Communication & IT Infrastructure, External Development & Landscaping
Compliance Framework MLC 2006 (Regulation 4.4), DGMA Circular No. 10 of 2024, DGMA Order No. 08 of 2024, SWBAT Service Standardisation & Compliance Framework
Operation & Maintenance Mumbai Port Authority through dedicated Seafarers' Welfare Charge of ₹3,000 per vessel call, ensuring long-term financial sustainability without recurring SWFS dependence
Current Status Technically appraised and recommended for financial assistance under SWFS, subject to submission of implementation modalities, grant release methodology, governance framework, Unified Online Booking System integration and other procedural requirements prior to execution.

Jawaharlal Nehru Port Authority (JNPA) – Nhava Sheva


Project Name Development of Seafarers' Club at JNPA
Location Port Facilitation Centre Building, Jawaharlal Nehru Port Authority (JNPA), Nhava Sheva, Navi Mumbai, Maharashtra
Implementing Agency Jawaharlal Nehru Port Authority (JNPA)
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Greenfield Seafarers' Welfare Facility (Inside Port Premises) – Interior Development of Existing Building
Built-up Area Approximately 12,000 sq. ft. (First Floor, Port Facilitation Centre)
Original Estimate ₹3,06,23,556/- (including two transport vehicles)
SWFS Grant Approved ₹2,66,39,384/- (inclusive of applicable taxes and vehicle cost)
Funding Coverage Restricted exclusively to capital expenditure — infrastructure development, furnishing, equipment procurement and vehicles; cannot be utilized for operational or recurring expenses
Indoor Facilities Reception & Lounge, Café & Restaurant, Indoor Games Zone, Audio Visual Room with Karaoke, Prayer Room, Saloon, Spa & Massage, Utility Shops, Maritime Museum, Medical Counselling Centre (with DG Shipping approved doctor), Conference Room, Digital Library / E-Library, Foreign Exchange Counter (RBI approved), Administrative Office
Outdoor Facilities Basketball Court, Cricket Practice Turf, Open Terrace Smoking Zone, Landscaped Areas
Transport Facility Free Shuttle between Terminal and Seafarers' Club (two vehicles procured under approved grant)
Scope of Work Interior Development & Civil Finishing, Architectural Interiors, Furniture & Fixtures Procurement, Electrical & Networking & IT Infrastructure, Recreational Facilities Installation, Café & Restaurant Setup, Library & Conference Establishment, Medical Counselling Centre, Maritime Museum, Utility Shops, Outdoor Recreational Facilities, SWFS Branding
Procurement Mode GeM and/or CPPP in accordance with GFR
Project Monitoring JNPA with SWFS-appointed Project Monitoring Agency (PMA) for inspection; periodic progress reports, Completion Certificate & Final Completion Report, Detailed Accounts & Utilization Certificates
Compliance Framework MLC 2006 (Regulation 4.4), SWFS Welfare Infrastructure Network, SWBAT
Current Status Grant Agreement between SWFS and JNPA executed; sanctioned amount of ₹2,66,39,384/- forwarded to JNPA; implementation underway in accordance with approved proposal and agreed framework.

Seafarers Outreach Centre – Patna (SWFS/MMD Office)


Project Name Seafarers Outreach Centre – Renovation & Interior Development Works, Patna
Location Nutan Rajdhani Anchal, Patna Nagar Nigam, Beli Road, Adalat Ganj, Veer Chand Patel Road, Patna, Bihar – 800001
Implementing Agency Directorate General of Shipping (DGS) through Indian Port Rail & Ropeway Corporation Ltd. (IPRCL)
Project Management Consultant Indian Port Rail & Ropeway Corporation Ltd. (IPRCL)
Funding Agency Seafarers Welfare Fund Society (SWFS)
Project Type SWFS/MMD Outreach Centre – Adaptive Reuse & Comprehensive Interior Renovation of Existing Government Building (Administrative & Welfare Facility)
Total Project Cost Approximately ₹36.00 lakh plus applicable GST and statutory charges (DPR estimate: ₹33.55 lakh renovation + 1% DPR fee + 6% PMC charges)
SWFS Funding Approved Entire Project Cost — approximately ₹36.00 lakh plus GST and applicable charges approved by Committee of Management (SWFS)
Funding Coverage Complete project cost covering civil renovation, interior development, electrical & plumbing upgradation, HVAC, modular furniture, IT infrastructure, LAN, CCTV, office automation, branding and signage
Indoor Facilities Welfare Officer Cabin, Welfare Reception & Information Centre, Nautical Surveyor Office, Engineer Surveyor Office, Administrative Workstations, Conference & Meeting Room, Visitor Waiting Area, Lounge Space, Pantry, Record Management & Storage, Digital Office Infrastructure, Public Interface & Stakeholder Facilitation Area
Major Works Civil Renovation (surface preparation, premium painting, vitrified tile flooring, decorative wall panelling, false ceiling, UPVC/aluminium windows, flush doors, brick masonry modifications), Plumbing & Sanitary Works (washroom renovation, CPVC/PPR water supply, drainage improvements), Electrical & IT Infrastructure (complete rewiring, DB with MCB/RCCB, LED lighting, air-conditioning, LAN networking, CCTV surveillance, computers, printers, office automation), Modular Furniture, Interior Branding & Signage
Compliance Framework MLC 2006 (Regulation 4.4), SWFS Welfare Infrastructure Network, Maritime India Vision 2030, NBC 2016 and applicable Government standards
Implementation Period Approximately 3 Months (execution) followed by commissioning and operational readiness
Current Status DPR completed; technical feasibility established; comprehensive architectural layouts, technical specifications and cost estimates finalized; entire project funding of approximately ₹36.00 lakh plus GST approved by Committee of Management (SWFS); implementation proposed through IPRCL under structured execution schedule.

Royal Bombay Seamen's Society (RBSS) – Mumbai


Project Name Modernization and Upgradation of Prince of Wales Seamen's Club, Ballard Estate, Mumbai
Location Ballard Estate, Mumbai
Implementing Agency Royal Bombay Seamen's Society (RBSS)
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Heritage Building Modernization & Seafarers' Welfare Infrastructure (Outside Port Premises)
Heritage Significance Established over 190 years ago — One of India's Oldest Maritime Welfare Institutions; Notified Heritage Property
Accommodation Capacity Approximately 150 Seafarers in 73 Rooms (Family Rooms, Single Occupancy, Twin-Sharing Rooms, Dormitories)
Estimated Project Cost Approximately ₹11.50 Crore (inclusive of GST)
SWFS Financial Assistance ₹7.50 Crore (In-Principle Approval); Balance expenditure to be met by RBSS through own resources
Funding Methodology Milestone-based Reimbursement — RBSS executes and pays for approved works; SWFS reimburses 50% of eligible expenditure upon satisfactory verification of invoices, utilization certificates and progress reports
Implementation Strategy Phased modernization while maintaining uninterrupted club operations throughout the implementation period
Phase-I Status Completed — 18 Twin-Sharing Rooms with Attached Washrooms modernized at a cost of approximately ₹1.68 Crore (March 2026)
Phase-II Status Under Implementation — 27 Single Occupancy and Class-C Rooms
Phase-III Scope Comprehensive Renovation of Common Areas, Lounges, Corridors and Remaining Shared Facilities
Major Facilities Accommodation, Recreational Lounges, Reading Room, Library, Chapel & Quiet Spaces, Dining & Refreshment Facilities, Modern Sanitary & Hygiene Facilities, Air-Conditioned Accommodation, Welfare & Administrative Support Services
Scope of Works Structural Repairs & Strengthening, Waterproofing & Anti-Corrosion Treatment, Heritage Façade Restoration & Protective Coating, Complete Replacement of Plumbing, Sanitary & Electrical Services, Flooring, Wall Finishes & Ceilings, Modern Fixtures, Furniture & Furnishings, Air-Conditioning Upgrades
Compliance Framework MLC 2006 (Regulation 4.4), DGMA Circular No. 10 of 2024, DGMA Order No. 08 of 2024, SWBAT Service Standardisation & Compliance Framework
Asset Ownership Royal Bombay Seamen's Society (RBSS) with facilities dedicated primarily to seafarer welfare under the SWBAT framework
Current Status Phased modernization under implementation. Phase-I completed (18 rooms operational); Phase-II under execution (27 rooms); Phase-III planned. SWFS in-principle approval of ₹7.50 Crore accorded; milestone-based reimbursement mechanism under formal Grant-in-Aid Agreement proposed for systematic execution and monitoring.

Nabik Griha Samity & Maritime Academy of India (MAI) – Taratala, Kolkata


Project Name Renovation, Modernization & Development of MLC 2006 Compliant Nabik Griha Samity & Maritime Academy of India (MAI), Taratala, Kolkata
Location 1/1, Diamond Harbour Road, CPT Colony, Taratala, Kolkata – 700088
Implementing Agency Indian Port Rail & Ropeway Corporation Ltd. (IPRCL) as Project Management Consultant (PMC)
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Integrated Seafarer Welfare & Maritime Training Infrastructure Development (Outside Port Premises) – Renovation of Existing Assets + Construction of New Facilities
Site Area Approximately 4,75,000 sq. ft. (comprising Seamen's Hostel, MAI Academic Block, Practical Workshop, Training Facilities, Administrative Buildings, Staff Quarters, Dining Hall & Kitchen, Open Grounds, Utility Infrastructure)
Base Project Cost Approximately ₹13.75 Crore (excluding GST and IPRCL PMC fees)
SWFS Funding Approved Approximately ₹13.76 Crore plus applicable GST, IPRCL PMC Charges and statutory taxes — approved by Committee of Management (SWFS) under Grant-in-Aid framework
Funding Coverage Complete scope of civil, architectural, MEP and associated infrastructure development including structural rehabilitation, new construction, electrical replacement, plumbing upgrades, HVAC, fire safety, CCTV, landscaping and utility services as proposed under the DPR
Renovation Works Seamen's Hostel Modernization, MAI Academic Building Renovation, Practical Laboratory Upgrades, Workshop Modernization, Manager's Quarters, Staff Quarters, Canteen Modernization, Administrative Buildings, Roads & External Development
New Infrastructure Girls' Hostel, Modern Academic Building, Swimming Pool, Fire Mock-up Training Facility, Advanced Maritime Laboratories, Digital Smart Classrooms, Medical Aid Centre, Sports & Recreation Facilities, Security Infrastructure, Utility Services
Compliance Framework MLC 2006 (Regulation 4.4), DG Shipping Training Requirements, STCW Standards, SWFS Welfare Infrastructure Network, Maritime India Vision 2030
Project Duration 18 Months from commencement of work (milestone-based execution with detailed engineering design, structural rehabilitation, new construction, procurement, quality assurance, commissioning and handover)
Current Status Comprehensive DPR completed by IPRCL following structural assessments, engineering investigations and stakeholder consultations; Committee of Management (SWFS) has approved financial assistance of approximately ₹13.76 Crore plus applicable GST, IPRCL PMC Charges and statutory taxes; project proposed for implementation in accordance with approved execution methodology and funding framework.

Vizhinjam Seafarers Club (Phase II) – Kerala


Project Name Development of MLC 2006 Compliant Seafarers Club, Vizhinjam (Phase II)
Location Vizhinjam, Kerala (Outside Port Premises) – in close proximity to Vizhinjam International Deepwater Multipurpose Seaport, with connectivity to NH Network, Trivandrum City, Trivandrum International Airport and Railway Network
Implementing Agency Project Proponent / Port Authority
Funding Agency Seafarers' Welfare Fund Society (SWFS)
Project Type Greenfield Seafarers Welfare Club (Outside Port Premises) – Purpose-Built RCC Framed Building with External Infrastructure
Built-up Area Approximately 12,912 sq. ft. (RCC Framed Structure)
Total Estimated Cost ₹9.20 Crore (Building Construction: ₹6.20 Crore + External Infrastructure & Additional Facilities: ₹3.05 Crore)
SWFS Funding Approved ₹3.50 Crore — approved by Committee of Management (SWFS); balance project cost to be arranged by implementing agency from own resources or other approved funding sources
Funding Coverage SWFS grant of ₹3.50 Crore towards implementation; balance funding by implementing agency covering civil construction, architectural finishes, external infrastructure, MEP services, HVAC, fire protection, furniture, interiors, IT, CCTV, landscaping and utility works as per detailed BOQ
Indoor Facilities Comfortable Accommodation, Reception & Information Desk, Dining Hall, Kitchen & Pantry, Recreation Lounge, Indoor Leisure Facilities, Communication & Internet Facilities, Common Gathering Areas, Modern Sanitary Facilities, Security & CCTV Surveillance
Outdoor & External Facilities Internal Roads & Pathways, Parking Facilities, Landscaped Open Spaces, Storm Water Drainage, Water Supply Network, Sewage System, Hardscaping, Security Infrastructure
Scope of Work RCC Framed Building Construction, Architectural Finishing, Waterproofing, Plumbing & Sanitary Installations, Internal & External Electrical Systems, HVAC System, Fire Fighting & Fire Alarm & PA System, IT Network, CCTV Surveillance, ELV Infrastructure, Access Control System, Furniture & Interior Fit-outs, Kitchen Infrastructure, External Water Supply & Sewerage, Parking, Storm Water Drainage, Site Grading, Landscaping & Hardscaping
Compliance Framework MLC 2006 (Regulation 4.4), SWFS Welfare Infrastructure Network, CPWD Standards and applicable Government engineering norms
Current Status Detailed cost estimate and Bill of Quantities prepared covering civil construction, external infrastructure, MEP services, furniture, interiors and utility works; Committee of Management (SWFS) has approved financial assistance of ₹3.50 Crore; project proposed for phased execution following completion of statutory approvals and procurement formalities.